OIL & GAS (ONSHORE)

Engineering, Procurement & Construction Contract :

1. BP INDONESIA Tangguh – Papua     

Project       : Supply for Tangguh Site Fire Aspirating System Detection ICAM XTRALIS IFT (4 Channel & PSU).

Client          : BP INDONESIA

Location    : Tangguh Site

Year             : 2012

2. CHEVRON East Kalimantan

 Project       : Supply, & Commissioning Fire Suppression Monitoring Panel for Flooting Roof Tank Foam System.

Client          : PT. BUKAKA TEKNIK UTAMA

Location    : Flooting Roof Tank Foam System Monitoring Panel Room

Year             : 2011

3. Pertagas Bontang East Kalimantan

Project        : Design, Supply, Fire Suppression System FM 200, Fire Alarm System & Fire Aspirating System Detection ICAM FT Pico.

Client           : PT. WAHANA ADIREKSA PRATAMA

Year              : 2009

4. RIM SEAL TANK PROTECTION Lawe-Lawe – East Kalimantan

Project       : Supplying Fire Alarm System Simplex Grinnel, Fire Detection System Tube Fire Trace USA.

Client          : CHEVRON INDONESIA COMPANY

Location    : Rim Seal Tank

Year             : 2007

5. BP TANGGUH Papua

Project        : Design and Engineering Fire System For BP. Tangguh BD1 Project CO₂ Suppression System, Sprinkler, EWASD, Hydrant, Portable and Fire Alarm Syatem.

Client           : PP AND ENCONA JOIN VENTURE

Location     : BD 1 Project

Year              : 2006

6.  UNOCAL INDONESIA East Kalimantan

Project         : Tank Rim Seal Protection Unocal – Tanjung Santan Terminal. Engineering, Procurement & Construction of tank rim seal protection using Wormald Nimbus RP 40 Foam System for Floating Roof Tank. The system proposed for Halon replacement to protect Rim Seal Floating Roof Tank C&D against the possible fire exposure, using FFFP Foam Liquid. The tank nominal diameters 80 meter, 27 meter high, contain crude oil equivalent 500.000 barrel. Works included 14 units of Wormald Nimbus RP40 skid with fully automatic system controlled by FIELDBUS SYSTEM. System Engineering & Design was supported by Wormald Ansul (UK).

Client           : CV. SANOBAR

Location     : Tj. Santan Terminal Tank C & D (Pasir Rigde Complex-East Kalimantan)

Year              : August 2002-January 2003

7. UNOCAL INDONESIA East Kalimantan

Project        : Foam Rim Seal Fire Protection System

Client           : CV. CIPATRA PUTRA CEMERLANG

Location     : Tj. Santan Field

Year              : 2001

8. UNOCAL INDONESIA East Kalimantan

Project        : Foam Rim Seal Fire Protection Protection Unocal-Lawe  Lawe

Engineering, Procurement & Construction of tank rim seal protection using Wormald Nimbus RP 40. The system proposed for Halon replacement to protect Rim Seal Floating Roof Tank C&D against the possible fire exposure. The tank nominal diameters 80 meter, 27 meter high, contain crude oil. Works included 10 units of Wormald Nimbus RP40 skid with fully automatic system monitored by TFX 500 Grinnell Fire Alarm Control Panel. System Engineering & Design was supported by Wormald Ansul (UK) Ltd.            

Client           : PT. DUTA INSTRUMENT ALFA SAKTI

Location     : Lawe-lawe Field (Pasir Ridge Complex-East Kalimantan)

Year              : July-December 2001

9. UNOCAL INDONESIA East Kalimantan

Project        : Grinnell Fire Alarm System       

Client           : CV. DAHANA (East Kalimantan)

Location     : Lawe-lawe Field

Year              : 2001

10. UNOCAL – Tj. SANTAN  TERMINAL
 

Project         : Tank Rim Seal Protection Unocal – Tanjung Santan  Terminal, Engineering, Procurement & Construction of tank rim seal protection using Wormald Nimbus RP 40. The system proposed for Halon replacement to protect Rim Seal Floating Roof Tank C&D against the possible fire exposure. The tank nominal diameter 80 meter, and 27 meter high,  contain crude oil. Works included 7 units of Wormald Nimbus RP40 skid with fully automatic system monitored by EST 3 Edward Fire Alarm Control Panel. System Engineering & Design was supported by Wormald Ansul (UK) Ltd.              

Client           : UNOCAL INDONESIA COMPANY

Location     : Tanjung Santan Terminal, East Kalimantan

Date              : August 2001 – January 2002