OIL & GAS (OFFSHORE)

Engineering, Procurement & Construction Contract :

1. Project Name : Total E & P Indonesie (Balikpapan-East Kalimantan)

Client           : PT. Singgar Mulia

   

Product      : Recheck Existing Pipe System, Recalculate Hydraulic Fire Suppression System Inergen 150 bar on CPU-2 (MV/LV Electrical Room, Switch Gear Room, Technical Room), TCP (Emergency Room, Instrument Room, Battery Room, Electrical Room), OWT (Electrical Room, Instrument Room), TRF (Local Operation Room, Instrumentation Room, Telkom Shelter Room, Switch Room). Total Inergen Cylinder 98, Cap. 12.4 m³/Cylinder.

Year             : December 2012

2. Project Name : Total E & P Indonesie (Balikpapan-East Kalimantan)

Client           : PT. Singgar Mulia

  

Product       : Recheck Existing Pipe System, Recalculate Hydraulic Fire Suppression System Inergen 150 bar on CPU-1 (Control Room, Technical Room), (Switch Gear Room, Emergency Room, Electrical Room), Total Inergen Cylinder 32, Cap. 12.4 m3/Cylinder. Redesign of The System CO2 in to The Inergen System On The NCB (Control Room, Electrical Room, Technical Room). Total Inergen Cylinder 58, Cap. 12.4 m3/Cylinder.

Year             : May 2012

3. TOTAL E & P INDONESIE East Kalimantan 

Project        : Review & Redesign Fire Suppression Inergen System 150 Bar.

Client           : PT. SARI WIJAYA ABADI

Location     : Radio Shelter

Year              : 2011

4. TOTAL E & P INDONESIE East Kalimantan

Project         : Facility UP Grading Control System for Inergen Fire Suppression Actuation From 24 VDC to 48 VDC Supplying Inline Resistor, HF Actuator, Lever Actuator, Booster Actuator

Client            : CV. SARIWIJAYA

Year               : 2006

5. TOTAL E & P INDONESIE East Kalimantan

Project          : Fire Suppression Inergen System 150 BAR

Client             : PT. MEINDO ELANG INDAH

Location      : Tunu Base Camp

Year               : 2004

6. TOTAL E & P INDONESIE East Kalimantan

Project          : Fire Suppression Inergen System 150 BAR

Client             : PT. PUNJ LLOYD INDONESIA

Location       : Pechico 4

Year                : 2004

7. TOTAL E & P INDONESIE East Kalimantan

Project           : Fire Suppression System ANSUL CO₂

Client              : CV. SURYA GEMILANG

Location        : Reboiler Room (TUNU CPU)

Year                 : 2004

8. TOTAL E & P INDONESIE East Kalimantan

Project            : Halon Replacement Fire Suppression Inergen System 150 BAR

Client               : CV. RAHAYU

Year                  : 2003

Leave a Reply